Electric Department
Non-Recoverable Cost of Temporary Service
Charges for temporary service installations are base on the estimated non-recoverable costs of installing and removing the necessary facilities to render electric service. In addition, the customer receiving service will pay the cost of energy which will be billed on the applicable tariff.
Predetermined Costs
|
1.
|
Metering:
|
| |
Secondary metering, single phase, self-contained |
$35.00 |
| |
Secondary metering, single phase, with current transformer |
$189.00 |
| |
Secondary metering, three phase, self-contained |
$46.00 |
| |
Secondary metering, three phase, with current transformer |
$206.00 |
| |
Primary metering, single phase |
$475.00 |
| |
Primary metering, three phase |
$855.00 |
2.
|
Line Extensions (Primary or Secondary - transformers not included):
|
| |
|
Installation
|
Removal
|
Total
|
| |
1 Pole tap, single phase |
$303.00 |
$60.00 |
$363.00 |
| |
2 Pole tap, single phase |
$455.00 |
$95.00 |
$550.00 |
| |
3 Pole tap, single phase |
$615.00 |
$121.00 |
$736.00 |
| |
4 Pole tap, single phase |
$758.00 |
$165.00 |
$923.00 |
| |
1 Pole tap, three phase |
$526.00 |
$104.00 |
$630.00 |
| |
2 Pole tap, three phase |
$755.00 |
$145.00 |
$900.00 |
| |
3 Pole tap, three phase |
$989.00 |
$183.00 |
$1,172.00 |
| |
4 Pole tap, three phase |
$1,212.00 |
$230.00 |
$1,442.00 |
3.
|
Transformers - Single Phase and Three Phase
|
| |
Total KVA not to exceed
|
Installation
|
Removal
|
Total
|
| |
37.5 KVA |
$65.00 |
$30.00 |
$95.00 |
| |
75 KVA |
$90.00 |
$45.00 |
$135.00 |
| |
167 KVA |
$145.00 |
$75.00 |
$220.00 |
| |
300 KVA |
$210.00 |
$100.00 |
$310.00 |
| |
500 KVA |
$270.00 |
$150.00 |
$420.00 |
Notes:
|
| 1. |
Where installation involves transformer (single phase) or transformer bank (three phase) and a one, two , three, or four pole tap, the charge for the transformer(s) and metering should be added to the charge for the line to determine the total non-recoverable cost to be charged to the customer. |
| 2. |
Where line extensions in excess of four poles and transformer installations in excess of 500 KVA are required, estimates will be secured from the Electric Department before non-recoverable costs are quoted to the customer. |
| 3. |
All line estimates are based on #2 aluminum conductor. |
| 4. |
No money for clearing right-of-way is included in line estimates. This should be added to costs if applicable. |
| 5. |
Estimates include money for surveying and engineering expense. |
| 6. |
Charges in the aforementioned schedule include one service drop. |
|